The digital platform works on smartphones and PCs
"MiS-150" made 127 successful flights
The complex is equipped with a variable rate metering system
The Project 00840 "Karelia" Vessel Will Make 5 Cruises
Passenger seats will become more comfortable due to the absence of metal joints
The system will be developed by "Bureau 1440"
The drone does not require a runway or catapult to launch
The new model combines the functions of a crane, lifting platform and drilling rig
The previous price was maintained for the "base" model
The 11D58M engine is considered one of the most complex to manufacture
Mass production of the power plant will be налажен in November 2025
No similar studies have been conducted in the world before
If the license expires between January 1, 2022 and December 31, 2025, it will be automatically extended
Project 22220 vessel connected to shore power
Factory tests of drones will be completed by the end of the year
50 drones produced monthly