
Kurchatov Nuclear Power Plant Relaunches Fourth Power Unit
Its scheduled maintenance is complete

Its scheduled maintenance is complete

The complex monitors engines, turbines, boilers, pumps, and other equipment, reducing failure rates and increasing reliability by 35-50%

The solution is currently slower than products from foreign vendors, but the cards in these servers are cheaper and more energy-efficient

The development can be used in arctic conditions

The mobile unit allows examining large objects and products of complex geometric shapes on-site

KMZ development is being installed on Afalina boats

The work was carried out by specialists from Atomenergo remont

Rosatom: Work is underway on power unit No. 1

The main feature of the model is the absence of a toe and shock absorber on the crankshaft

It has 100% localization in Russia

The development replaced foreign counterparts

Rostec Invested 2.5 Billion Rubles in Modernizing Mining Equipment

The machines are equipped with new cabs - Comfort Cab III (S520) and Luxury Cab II (S530/S620)

Power plants of this class will replace foreign counterparts