
Russia to Sell New Turbines to Argentina
The equipment will be installed at a hydroelectric power plant in the province of Neuquén

The equipment will be installed at a hydroelectric power plant in the province of Neuquén

Likhachev stated that the state corporation plans to build two more power units after the situation in the country normalizes

Production is loaded thanks to new contracts

AI and digital twins help to model assembly stages in advance

The company is eliminating the legacy of the bankrupt Soviet chemical plant "Crystal" in Kyrgyzstan

The elevator market and the fall in public procurement have increased pressure on the industry

Engineers will unload the reactor core and update the station's critical safety systems

Since 2006, UEC-Gas Turbines has built 103 GTA-6RM units

The goal is to increase the lifespan to 1000 cycles and reduce the cost of batteries

"RM-Steel" will invest 2.7 billion rubles in the production of 50 thousand tons of metal annually

Engineers are assembling the station frame and preparing the site for the launch of turbines on the Argun River

Two Power Units of 1 GW Each to Be Launched in 2033 and 2035

Equipment from JSC "New ERA" will ensure the operation of reactor control systems

The cost of production has decreased significantly

The station is operating normally, radiation levels are normal