
KMZ Developed a Set of Jacks for Repairing MCP at Nuclear Power Plants
The equipment is also suitable for installing the Main Circulation Pump of the unit

The equipment is also suitable for installing the Main Circulation Pump of the unit

At the plant producing cabin frames, 117 robots work alongside 223 personnel

The new RECOM system was first used during the launch of the heavy-lift Angara-A5 rocket

The share of Russian components is steadily growing

Students will be trained in printed circuit board assembly technology

The production site will appear in 2025

Rosatom State Corporation strengthens cooperation with the Republic of the Congo in nuclear and hydropower

The icebreaker was laid down in January 2024

State Corporation to expand staff to 440,000 people

The blocks are being installed by a heavy-lift crane with a lifting capacity of 1350 tons

This is the first domestic industrial gas turbine engine of such power and with a design efficiency of up to 40%

The vessel is capable of staying at sea for up to 45 days and has a gross tonnage of over 1000 tons

Russian companies and the Nigerian government have agreed to restore the Ajaokuta Steel Plant.

The new product will be manufactured by the end of this year

This was announced by the Mayor of Moscow, Sergei Sobyanin