The joint venture "RT-Proektnye Tekhnologii" (Rostec) and "Akron" holding – "Akron PT" – has launched serial production of mobile electrical substations, the state corporation announced. The mobile solution on a transport wheeled platform allows for the restoration of power supply in the shortest possible time in case of damage to stationary facilities.

Mobile substations ensure power supply to socially significant facilities and strategic consumers, as well as provide power during scheduled repairs and reconstructions without load limitations.

According to experts' calculations, the presence of two to four mobile substations in a region can cover any emergency need. The solution boasts high mobility – the substation can be installed on various types of truck trailers, including off-road ones. The complexes support different voltage classes and can be equipped with transformers of various capacities.

Rostec emphasized that the substations are supplied fully equipped and undergo all necessary tests, so they can be connected to the power system immediately upon arrival at the site. The state corporation also noted that the use of these systems is particularly relevant due to the high drone threat and the risk of blackouts.

Read more on the topic: