Stoilensky Mining and Processing Plant (GOK) in the Belgorod region has launched the production of buckets for mining excavators after restoring its own repair base. This gives the company flexibility in terms of repair times and formats, and also strengthens internal competencies.
A full cycle of work has been organized at the updated site of the workshop for the maintenance and repair of mining equipment - from the repair of large shovels and linings to the manufacture of excavator buckets and other various metal structures.
This year we plan to manufacture 10 buckets of 12 m³ and 10 m³, which is about 25% of the plant's annual demand for these types of spare parts.
The plant's own repair base ensures the reliability of equipment and the stability of production.
Читайте ещё материалы по теме:
Now on home
The K1892VM21Ya chip helps recognize objects in real time
There were 85 people on board the plane. The landing was successful, and the passengers were sent on a reserve flight
"UEC-Saturn" Demands $30 Million from Partners in the SaM146 Engine for the "Superjet"
Websites from the "whitelist" open, the rest do not
TsAGI has completed the preliminary technical design stage
The 88-ton structure will protect the reactor from loads
Reconstruction turned into a criminal case: the cost of work was unreasonably inflated, and cracks appeared on the runway
Mockup of anti-aircraft system spotted during transportation in Alabama
Manturov promised to complete the work on the aircraft
Models M70 and M90 have already appeared in dealerships across the country