Construction of the Shelepiha gas pipeline duct has begun under the Moscow River. This was announced by the Mayor of Moscow, Sergei Sobyanin.
The gas pipeline will connect Bolshaya Filevskaya Street with the Shelepiha embankment. This will improve the reliability of gas supply to the central and western parts of the city.
A high-pressure steel pipe is laid in a special casing - this protects it from external influences. Domestic materials with a service life of more than 40 years are used.
The main part of the gas pipeline duct will pass at a depth of more than 10 meters. The microtunneling method is used for construction (without noise, trench digging and harm to the environment).
Earlierwww1.ru reported that "Roselectronika"developed an infrared camera for detecting methane leaks in gas pipelines.
Read materials on the topic:
Pipe of help: Russia is ready to export gas to China through Kazakhstan
Retaliatory nuclear strike: Russia has limited the export of enriched uranium to the United States
Now on home
The service contains data on 45,000 fraudulent sites
The state has accelerated the introduction of unmanned solutions, integrating them into the real sector of the economy
Modernized engines may equip the Lada Azimut crossover
The price is 132 billion 265.8 million rubles
The manufacturer plans to strengthen its lineup of light commercial vehicles
The production of carbon fiber was organized in the shortest possible time
Electric vans will speed up the repair of urban transport infrastructure
Countries are working to synchronize regulations in the field of AI
The service's average daily audience is 55 million people
Stable Isomaterial Based on Metakaolin Has a Density Below 300 kg/m³
Re-identification quality improved twofold with new DynaMix method
Russians will be able to find out about debts online