Rosatom Doubles Production Speed: Giant Machine Commissioned at St. Petersburg Metallurgical Plant

The equipment will allow drilling holes up to 23 meters deep

A deep drilling machine has started operating at the "AEM-Spetsstal" metallurgical plant. This was reported by the press service of the State Corporation "Rosatom".

The new equipment is more efficient than its counterparts in terms of technical parameters.

The introduction of new high-tech equipment at "AEM-Spetsstal" will double the pace of manufacturing parts for the nuclear industry, energy sector, and icebreaker fleet – industries where very strict requirements have always been imposed on quality and adherence to deadlines.
Alexey Likhachev, General Director of Rosatom

The length of the machine is more than 56 meters (like three subway cars). The device will allow to hone and drill holes up to 23 meters deep. High processing accuracy is ensured through the integration of digital solutions.

Earlier, www1.ru reported that Rostec developed an improved version of a machine for aircraft engine construction.

Read materials on the topic:

The first giant machine stamping parts for aviation enterprises was produced in Russia

The first Russian machine for cutting metal with water will be produced in Chelyabinsk

Russia is import-substituting machine tools for the defense industry, aircraft industry, and engine builders

Now on home