At Baikonur, preparations are underway for the space truck's September flight to the ISS
"Rostselmash 3580" Equipped with PowerShift Automatic Transmission
The vessel will operate between the mainland part of Primorye and the island regions
Plant specialists conducted a comprehensive inspection and maintenance of key production lines
The device is designed to automate the most labor-intensive stages of product assembly
JSC "RIR Energo" has completed 65% of the work to modernize the power plant's capacity
Will allow aircraft to perform vertical takeoff and landing without the need for a runway
The project documentation for these works received a positive conclusion from the Glavgosexpertiza of Russia
Authorities are discussing a fee for the use of automation
The operation and monitoring of their work are carried out remotely via a special mobile application