
Main switchboard loaded onto the under-construction nuclear icebreaker Chukotka
The fifth vessel of Project 22220 is being built at the Baltic Shipyard

The fifth vessel of Project 22220 is being built at the Baltic Shipyard

The vessel became the fourth in the project 22220

The nuclear-powered ship is currently moored at the embankment of the Baltic Shipyard USC on the Neva River

Sea Trials Begin for Project 22220 Vessel

The icebreaker was laid down in January 2024

To develop the route, the option of involving ships without an ice class in transportation is being considered