
With a video camera and remote control: Kalugaputmash plant assembled a UK-25/25 tracklaying crane
The first crane with a new generation cabin was sent to Severstal

The first crane with a new generation cabin was sent to Severstal

The body was adapted for operation in Siberian mines

New steel is 1.5 times more resistant to corrosion

The balls are needed for grinding ore, coal and cement

The truck is designed for long-distance transportation