ОДК раскрыла процесс проверки лопаток авиадвигателей ПД-8 и ПД-14: на строжайшем контроле

На лопатки агрегатов оказывают воздействие высоких температур, вибрации и аэродинамического напряжения

At the enterprises of the United Engine Corporation (UEC, part of Rostec), when creating reliable aircraft engines, attention is paid to the quality of each part.

PD-8 aircraft engine in the assembly shop of the UEC-Saturn Rybinsk enterprise

For example, aircraft engine blades are subjected to extreme loads, including vibration, high temperatures and aerodynamic stress.

Controllers carefully and thoroughly check each blade. This is a multi-stage process that includes measuring geometric parameters, visual inspection, fatigue tests, X-ray and fluorescent inspection.
UEC

X-ray inspection shows possible internal defects in parts, and fluorescent inspection shows external defects. They belong to non-destructive testing methods, which allow detecting the smallest pores and cracks.

Read more materials:

While Boeing doors are falling off: MS-21 was called the hope of Russian aviation

PD-8 and PD-14 aircraft engines will be produced faster: UEC has discovered a new production method

Heavy transport aircraft Il-76MD will be modernized for the military