
Due to ice, ships take 4.5 hours to dock at the "Osterra" terminal
The company has involved ice-class tugs

The company has involved ice-class tugs

Some trainsets were sent for repairs

The train consists of 142 cars and transports products from a petrochemical enterprise

The vessel's main task is to provide towing of non-self-propelled objects and floating structures

Restoration work is organized in a limited capacity mode - schedule delays reach up to 3.5 hours

Each trainset offers 850 seats, USB charging, bicycle parking, and air disinfection systems

Deliveries are ahead of schedule - the entire batch of 57 vehicles is planned to be handed over early

The machine is equipped with the most powerful engine in the lineup - 550 hp

Automated system controls microclimate and CO₂ levels in the insulated van

GTLK delivered 9 buses to AO "Mostransavto"

The departments are exploring the possibility of fixing the maximum coefficient to the base rate

The new model has four SAF axles, a reinforced chassis, and aluminum wheels

The developers say there are no equivalents to the model either in Russia or abroad

The special vehicle can fight fires at military depots