
The fifth unit of Novovoronezh NPP returned to the grid after repairs: for now it operates at 50% capacity
The power unit with a VVER-1000 reactor was connected to the power system on the evening of September 30 after a month-long shutdown

The power unit with a VVER-1000 reactor was connected to the power system on the evening of September 30 after a month-long shutdown

The composition remains liquid for more than 2 hours, and in a hot formation, it turns into a strong polymer

Comparing vacuum infusion and autoclave molding by cost, design, and production

Udokan's resources exceed 26 million tons of copper

The customer received 12 vehicles on the KAMAZ-43118 all-wheel drive chassis

New boiler house to provide heat to the enterprise from December 2026

They are effective at temperatures from -50 to +50 degrees, says the developer

Sales will start in the fourth quarter; together with the keyboard, it will form a complete set

The peak cost will be in 2027

One operator will be able to control several cranes in sequence

Deputy Prime Minister linked this work to reducing fuel shortages

Novak: Enterprises that are behind schedule will have the opportunity to complete the work

Sberbank outlined three scenarios for the microelectronics market development until 2036

Analysis will show prospects of oil and gas fields without drilling

Investigation revealed inflated production costs for state defense orders