
T-72B3M Tanks Forbidden to Turn Off Engines During Tests
At the proving ground, the vehicle must operate continuously throughout the entire program

At the proving ground, the vehicle must operate continuously throughout the entire program

"Voennaya Khronika": new "mangal" covered the turret equipment

Before shipment, each tank undergoes at least 100 km of tests, checking weapons, navigation, and onboard systems

The combat vehicle was able to start and drive away

The active protection system is capable of shooting down FGM-148 Javelin missiles

Major Bestemyanov: "The tank is still capable of direct fire"

The system's maximum ammunition capacity is 12 counter-shots

Heavy smoke simulates vehicle destruction, but it continues to operate

The heart of the system is a Doppler radar station

Hundreds of modernized combat vehicles are in the arsenal

Andrey Kozlov's scheme involves diverting exhaust into the engine-transmission compartment

The "Tucha" system, along with smoke, ejects a cloud of fine shrapnel

CHTZ is demanded 545 million rubles, another 196 million are penalties

"Military Informant": Belarusian BTR-70MB1 modernization also noticed in LNA arsenal