The number of "our down to the last screw" SJ-100s has reached 24 aircraft

"Yakovlev" is preparing to send the aircraft to airlines after certification

There are 24 SJ-100 aircraft in serial assembly at the plant in Komsomolsk-on-Amur. This was reported by PJSC "Yakovlev" (part of the United Aircraft Corporation of the Rostec State Corporation).

As soon as all systems have been tested, including the PD-8 engines, the aircraft will be sent to fly throughout Russia.

Further plans for it - we expect the end of certification and will prepare for transfer to airlines.
Alexander Artemyev, Head of the Flight Test Station of the Production Center of PJSC "Yakovlev"

Rostec noted that the partial replacement of full-scale tests of aircraft engines with virtual models can speed up the creation of power plants. This approach is already being used in the creation of the PD-8 for the SJ-100.

However, the head of the design department of PJSC "Yakovlev", Ezhen Guryev, explained that there are no full-fledged digital twins of engines or aircraft yet, we are talking, rather, about a digital prototype.

Read more materials on the topic: