Минпромторг сократил план выпуска двигателей для МС-21 и SSJ-100 в 1,5 раза

Aircraft manufacturers will receive only 128 power plants instead of the planned 192

The Ministry of Industry and Trade has decided to reduce the number of aircraft engines for the promising MC-21, SSJ-100 and Tu-214 aircraft, which will be produced in Russia until 2026. Thus, instead of the planned 192 engines, aircraft manufacturers will receive only 128 power plants.

SSJ-100

Production plans until 2026 have been reduced by 1.5 times. In 2025, Russia will assemble 24 engines (11 PS-90, seven PD-14 and six PD-8), and in 2026 — 104 engines (32 PS-90, 28 PD-14 and 44 PD-8).

The press service of the Ministry of Industry and Trade noted that the changes are aimed at synchronizing plans with the provisions of the civil aviation industry development program (KPGA) until 2030.

Read more on the topic:

Will leave only MC-21: Aeroflot will transfer 34 contracted SSJ-100s to subleasing

Aeroflot plans to lease more than 300 MC-21s instead of SJ-100 and Tu-214

Aeroflot intends to buy out 47 Airbus and Boeing aircraft that are under operating lease