New long-length machine to be launched in Russia to speed up Tu-214 production

Portal 5-axis milling machining center with vacuum table — Russian development

According to PJSC UAC, the S.P. Gorbunov Kazan Aviation Plant has already prepared a site for the high-tech machine. From the beginning of 2025, it will be able to process aircraft components made of aluminum alloys up to 24 meters in size.

The launch of this equipment will significantly reduce the time for manufacturing long parts used in the construction of all aircraft in the Tupolev JSC line, which is especially important for fulfilling our large-scale task of increasing the serial production of Tu-214.
Konstantin Timofeev, First Deputy General Director of UAC, Managing Director of Tupolev JSC

UAC notes that the unique portal 5-axis milling machining center with a vacuum table is a domestic development. However, its manufacturer and detailed technical characteristics are not disclosed.

Earlier in June 2024, Konstantin Timofeev at a meeting with students said that currently "12 aircraft in various stages of readiness" are in work on the Tu-214 import substitution project. The conveyor line for their production has already been contracted.

Read materials on the topic:

Expensive, long, nobody needs it: why Russia may not receive a thousand civilian aircraft by 2030

UZGA's capacity is not enough to meet the demand for new Baikal aircraft

S7 to receive 100 modernized Tu-214 passenger aircraft

Irkutsk Polytechnic has begun developing aviation equipment and aviation technical documentation for Russian aircraft