
Nuclear Fuel "Melt Trap" Delivered to Construction Site of Power Unit No. 3 with VVER-1200 Reactor of Leningrad NPP-2
A heavy crawler crane with a lifting capacity of 2,000 tons will be used to install the equipment

A heavy crawler crane with a lifting capacity of 2,000 tons will be used to install the equipment

The equipment will be inspected and placed in the VVER-1200 reactor shaft

A batch of innovative TVS-5 fuel assemblies was loaded into the VVER-1200 reactor