
India Wants Il-276, But Demands Proof of PD-14M Engine Readiness
The FADEC-equipped powerplant must be adapted for the new military transport aircraft

The FADEC-equipped powerplant must be adapted for the new military transport aircraft

The enterprise will introduce a new section for strengthening large-sized parts

Before the production of Il-100 and Il-276, the emphasis will be on updating the branch of PJSC "Il-Aviastar"

Developing a new transport aircraft will take at least a decade

The state will finance the technical re-equipment of the plant - the first tranche is already in 2025

Roman Gusarov: A Lot Still Needs to Come Together for the Production of the Il-100 and Il-276 at "Aviastar"

The design of the aircraft has already begun at the Aviastar plant

The aircraft was to be equipped with promising PD-14 engines, but with modifications