
25 Tons of Metal and 5,800 Tubes: Sormovskaya CHPP Completes Major Overhaul of Turbine Unit
Power engineers replaced the condenser tube system, each 6.6 meters long

Power engineers replaced the condenser tube system, each 6.6 meters long

Diagnostics allowed assessing the condition of blades and nozzle guide vanes without opening the unit's casing

Russia plans to build data centers directly at power plants

The GTE-65.1 gas unit will likely need to be shut down for modifications