In China, flushing of all safety systems of the reactor plant has begun at power unit No. 7 of the Tianwan NPP. This is one of the most important technological stages before the assembly of the VVER-1200 (water-water power reactor). This was reported by the press service of the Rosatom State Corporation, which is participating in the project.
The flushing operation on the open reactor is necessary for the final cleaning of all pipelines from contamination remaining after installation, checking the operation of pumping units, technological safety systems and normal operation systems.
About the VVER-1200 reactor
This is the flagship reactor of Rosatom State Corporation. It has been installed at six power units: four in Russia and two in Belarus.
In China, specialists from the state corporation are building four power units with VVER-1200: two at the Tianwan NPP and two at the Xudapu NPP. A similar reactor plant will operate in Bangladesh, Hungary, Egypt and Turkey.
Read more on the topic:
Rosatom sent a reactor vessel to India for the sixth power unit of the Kudankulam NPP
USC and Rosatom will solve the problem of dredging in the Arctic zone
Rosatom promised to build the most beautiful and safe NPP in the European Union