
"Power Machines" tested the GTE-170.1 turbine for a new CHP plant in Khabarovsk
The design capacity of the station will reach 410 MW of electrical and 1389 Gcal/h of thermal energy

The design capacity of the station will reach 410 MW of electrical and 1389 Gcal/h of thermal energy

The equipment has successfully passed the control check program at the assembly stand