
The first Russian low-speed turbine received fire-resistant oil for operation at Kursk NPP-2
The domestic compound passed inspection and was poured into the control system of the power unit No. 1 turbine generator

The domestic compound passed inspection and was poured into the control system of the power unit No. 1 turbine generator

Equipment with cast insulation withstands -50 °C and aggressive environments