Для авиадвигателя-призрака ПД-26 ещё даже не начались опытные работы

Currently, only a virtual model of the unit exists

The new promising aircraft engine PD-26 has not yet reached the stage of research and development work (R&D). This follows from the statement of the General Director of the Additive Technology Center of the United Engine Corporation (UEC, part of the Rostec Group) Alexei Mazalov.

PD-35, on the basis of which PD-26 will be created
We are awaiting the opening of research and development technological work on the above-announced promising PD-26 engine.
Alexei Mazalov, General Director of the Additive Technology Center of UEC

It is known that the final tests of the PD-26 will be carried out on a flying laboratory. Currently, Il-76 aircraft are used for this purpose, in which one of the four engines is replaced.

Aviation expert Roman Gusarov also clarified that today there is only a PD-35 technology demonstrator, and not a PD-26.

PD-26

In fact, this is a physical or virtual model used to assess the production or technical feasibility, usefulness, and applicability of a particular technology, process, concept of the final system, or product being developed.

Earlier www1.ru reported that the toilet of a strategic bomber was shown in a photo for the first time.

Read more materials: