6 авг. 2025 г., 13:50:51
Dredger "Lotos-4" with a millingрыхлителем вышел на ходовые испытания на Волге
Productivity of the vessel of project 93.159.1 is 900 cubic meters of soil per hour
3 нояб. 2024 г., 13:45:24
900 Cubic Meters of Soil Per Hour: Dredger "Severo-Dvinsky-901" Completed Dredging in the Astrakhan Region
The vessel was put into operation in the summer of 2024