
New generation drilling rig launched at Kholmogorskoye field
Assembly of the 1600 hp, 52 MPa pressure complex now takes about 20 days

Assembly of the 1600 hp, 52 MPa pressure complex now takes about 20 days

The latest remote developments should forever change the landscape in the combat zone

Communication with the drone is maintained through an encrypted digital channel

Thanks to the system, UAV operators will be fully protected from possible retaliatory attacks