
Rostov engineer reduced turbine unit repair at NPP from 36-60 to 12 days
At the third power unit of the Rostov NPP, an inter-flange compensating insert was used to restore the axial clearances of the turbine

At the third power unit of the Rostov NPP, an inter-flange compensating insert was used to restore the axial clearances of the turbine