KB «Stapel»

Rostov Design Bureau "Stapel" completes the RDB 75.02 floating platform project for dredging operations
An excavator with a long boom, a crane, or equipment weighing up to 75 tons can be installed on the deck

With increased power and automation: Stapel Design Bureau has completed the development of the RDB50.07 pusher tug
The vessel is capable of pushing convoys of 4 barges with a displacement of up to 15,100 tons