KamAZ to Start Producing 8801.10 "Progress" Industrial Engines

The plant has received a certificate of compliance for the new unit

"Tutaevsky Motor Plant" ("TMZ", a subsidiary of "KAMAZ") has received a certificate of compliance for 8801.10 "Progress" engines. This was reported by the press service of the enterprise.

Engine 8801.10 "Progress"

In 2024, the plant manufactured and tested prototypes and prepared production for the release of a pilot batch of "Progress" engines.

The successful certification of 8801.10 "Progress" engines  is the result of a creative approach to the tasks, enthusiasm and conscientious work of engineers and workers from Tutaev, Naberezhnye Chelny, Yaroslavl, Barnaul and St. Petersburg, a vivid example of well-organized inter-factory cooperation of the KAMAZ Group enterprises.
Alexander Shevtsov, Deputy Chief Designer of PJSC "TMZ"

During additional tests, the possibility of developing modifications of TMZ V8 engines for use in agricultural and mining equipment with a capacity of 515-588 kW (700-800 hp), as well as for diesel power plants with a capacity of 350-400 kW (438-500 kVA) was also confirmed.

Earlier www1.ru reported that in the Perm region they assembled a small-sized gas turbine engine for fixed-wing UAVs.

Read materials on the topic:

For PD-14, PD-8, PS-90A and TV7-117ST-01: a complex for the production of hydromechanical control systems for engines will be built in Perm

We can't do without the sky: Rostec has expanded production for the production of aircraft engines

Part of the Russian aircraft engine TV7-117ST-01 was tested with fire