It became known when the serial production of Russian engines for An-124 "Ruslan" will begin

Shoigu: Russian D-18T engines will begin production at the end of 2027

Serial production of domestically developed D-18T engines for the An-124 "Ruslan" heavy transport aircraft (Antonov Design Bureau) is scheduled for the fourth quarter of 2027, said Russian Defense Minister Sergei Shoigu.

An-124-100
Currently, the serial production of Russian D-18T engines is being mastered
Sergei Shoigu

The Minister also drew attention to the importance of maintaining the An-124 fleet. It was previously reported that the "Ruslans" will be equipped with PD-3 turbofan engines with a take-off thrust of up to 40 tons.

According to plans, by 2025 the number of An-124 "Ruslan" military transport aircraft and civilian An-124-100 should double. In early January 2024, it became known that they want to install a full-size fifth-generation PD-35 turbofan engine on the An-124.

Read other news on the topic:

Tests of the Il-114-300 passenger aircraft have begun in the Moscow region

The fuselage of the Il-96-300 was assembled in Voronezh in three months